Showing 10 of 1618 results
Production cross sections of $\Upsilon$(1S), $\Upsilon$(2S), and $\Upsilon$(3S) states decaying into $\mu^+\mu^-$ in proton-lead (pPb) collisions are reported using data collected by the CMS experiment at $\sqrt{s_\mathrm{NN}} =$ 5.02 TeV. A comparison is made with corresponding cross sections obtained with pp data measured at the same collision energy and scaled by the Pb nucleus mass number. The nuclear modification factor for $\Upsilon$(1S) is found to be $R_\mathrm{pPb}(\Upsilon(1S))$ = 0.806 $\pm$ 0.024 (stat) $\pm$ 0.059 (syst). Similar results for the excited states indicate a sequential suppression pattern, such that $R_\mathrm{pPb}(\Upsilon(1S))$$\gt$$R_\mathrm{pPb}(\Upsilon(2S))$$\gt$$R_\mathrm{pPb}(\Upsilon(3S))$. The suppression is much less pronounced in pPb than in PbPb collisions, and independent of transverse momentum $p_\mathrm{T}^\Upsilon$ and center-of-mass rapidity $y_\mathrm{CM}^\Upsilon$ of the individual $\Upsilon$ state in the studied range $p_\mathrm{T}^\Upsilon$$\lt$ 30 GeV$/c$ and $\vert y_\mathrm{CM}^\Upsilon\vert$$\lt$ 1.93. Models that incorporate sequential suppression of bottomonia in pPb collisions are in better agreement with the data than those which only assume initial-state modifications.
Differential cross section times dimuon branching fraction of Y(1S) as a function of pT in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(2S) as a function of pT in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(3S) as a function of pT in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(1S) as a function of $y^{Y}_{CM}$ in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(2S) as a function of $y^{Y}_{CM}$ in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(3S) as a function of $y^{Y}_{CM}$ in pPb collisions. The global uncertainty arises from the integrated luminosity uncertainty in pPb collisions.
Differential cross section times dimuon branching fraction of Y(1S) as a function of pT in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Differential cross section times dimuon branching fraction of Y(2S) as a function of pT in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Differential cross section times dimuon branching fraction of Y(3S) as a function of pT in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Differential cross section times dimuon branching fraction of Y(1S) as a function of $|y^{Y}_{CM}|$ in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Differential cross section times dimuon branching fraction of Y(2S) as a function of $|y^{Y}_{CM}|$ in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Differential cross section times dimuon branching fraction of Y(3S) as a function of $|y^{Y}_{CM}|$ in pp collisions. The global uncertainty arises from the integrated luminosity uncertainty in pp collisions.
Nuclear modification factor of Y(1S) as a function of pT. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(2S) as a function of pT. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(3S) as a function of pT. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(1S) as a function of $y^{Y}_{CM}$. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(2S) as a function of $y^{Y}_{CM}$. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(3S) as a function of $y^{Y}_{CM}$. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(1S) at forward and backward $y^{Y}_{CM}$ for pT < 6 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(2S) at forward and backward $y^{Y}_{CM}$ for pT < 6 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(3S) at forward and backward $y^{Y}_{CM}$ for pT < 6 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(1S) at forward and backward $y^{Y}_{CM}$ for 6 < pT < 30 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(2S) at forward and backward $y^{Y}_{CM}$ for 6 < pT < 30 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
Nuclear modification factor of Y(3S) at forward and backward $y^{Y}_{CM}$ for 6 < pT < 30 GeV/c. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
RFB of Y(1S) versus $N^{|\eta_{lab}|<2.4}_{tracks}$.
RFB of Y(2S) versus $N^{|\eta_{lab}|<2.4}_{tracks}$.
RFB of Y(3S) versus $N^{|\eta_{lab}|<2.4}_{tracks}$.
RFB of Y(1S) versus $E^{|\eta_{lab}|>4}_{T}$.
RFB of Y(2S) versus $E^{|\eta_{lab}|>4}_{T}$.
RFB of Y(3S) versus $E^{|\eta_{lab}|>4}_{T}$.
Nuclear modification factor of Y(1S), Y(2S), and Y(3S) integrated over pT and $y^{Y}_{CM}$. The global uncertainty arises from the integrated luminosity uncertainties in pPb and pp collisions.
A search for pairs of Higgs bosons produced via gluon and vector boson fusion is presented, focusing on the four b quark final state. The data sample consists of proton-proton collisions at a center-of-mass energy of 13 TeV, collected with the CMS detector at the LHC, and corresponds to an integrated luminosity of 138 fb$^{-1}$. No deviation from the background-only hypothesis is observed. A 95% confidence level upper limit on the Higgs boson pair production cross section is observed at 3.9 times the standard model prediction for an expected value of 7.8. Constraints are also set on the modifiers of the Higgs field self-coupling, $\kappa_\lambda$, and of the coupling of two Higgs bosons to two vector bosons, $\kappa_\mathrm{2V}$. The observed (expected) allowed intervals at the 95% confidence level are $-$2.3 $\lt$ $\kappa_\lambda$ $\lt$ 9.4 ($-$5.0 $\lt$ $\kappa_\lambda$ $\lt$ 12.0) and $-$0.1 $\lt$ $\kappa_\mathrm{2V}$ $\lt$ 2.2 ($-$0.4 $\lt$ $\kappa_\mathrm{2V}$ $\lt$ 2.5). These are the most stringent observed constraints to date on the HH production cross section and on the $\kappa_\mathrm{2V}$ coupling.
Observed and expected 95% CL upper limits on cross section as a function of $\kappa_{\lambda}$ modifier
Observed and expected 95% CL upper limits on cross section as a function of $\kappa_{2V}$ modifier
An inclusive search for nonresonant signatures of beyond the standard model (SM) phenomena in events with three or more charged leptons, including hadronically decaying $\tau$ leptons, is presented. The analysis is based on a data sample corresponding to an integrated luminosity of 138 fb$^{-1}$ of proton-proton collisions at $\sqrt{s} =$ 13 TeV, collected by the CMS experiment at the LHC in 2016-2018. Events are categorized based on the lepton and b-tagged jet multiplicities and various kinematic variables. Three scenarios of physics beyond the SM are probed, and signal-specific boosted decision trees are used for enhancing sensitivity. No significant deviations from the background expectations are observed. Lower limits are set at 95% confidence level on the mass of type-III seesaw heavy fermions in the range 845-1065 GeV for various decay branching fraction combinations to SM leptons. Doublet and singlet vector-like $\tau$ lepton extensions of the SM are excluded for masses below 1045 GeV and in the mass range 125-150 GeV, respectively. Scalar leptoquarks decaying exclusively to a top quark and a lepton are excluded below 1.12-1.42 TeV, depending on the lepton flavor. For the type-III seesaw as well as the vector-like doublet model, these constraints are the most stringent to date. For the vector-like singlet model, these are the first constraints from the LHC experiments. Detailed results are also presented to facilitate alternative theoretical interpretations.
The minimum lepton $\mathrm{p_{T}}$ (GeV) distribution in 3L MisID CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The $\mathrm{S_{T}}$ (GeV) distribution in 3L WZ CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The $\mathrm{DR_{min}}$ distribution in 3L Z$\mathrm{\gamma}$ CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The distribution of $\mathrm{p_{T}^{miss}}$ (GeV) in 2L1T MisID CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The distribution of $\mathrm{M_{T}}$ (GeV) in 3L OnZ CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The distribution of $\mathrm{H_{T}}$ (GeV) in 3L ttZ CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
Distribution of BDT score from the SS-M ($\mathrm{B_{e}=B_{\mu}=B_{\tau}}$) BDT for the 3L+2L1T CR events for the combined 2016-2018 data set. The 3L+2L1T CR consists of the 3L OnZ, 3L Z$\mathrm{\gamma}$, and 2L1T MisID CRs. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The distribution of visible diboson $\mathrm{p_{T}}$ (GeV) in 4L ZZ CR events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
Distribution of BDT score from the SS-M ($\mathrm{B_{e}=B_{\mu}=B_{\tau}}$) BDT for the 4L ZZ CR events for the combined 2016-2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The distribution of $\mathrm{L_{T}}$ in all seven multilepton channels for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton of $\mathrm{m_{\tau'}}$ = 1 TeV in the doublet scenario, before the fit, is also overlaid.
The distribution of $\mathrm{p_{T}^{miss}}$ in all seven multilepton channels for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermion of $\mathrm{m_{\Sigma}}$ = 1 TeV in the flavor-democratic scenario, before the fit, is also overlaid.
The distribution of $\mathrm{H_{T}}$ in all seven multilepton channels for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. For illustration, an example signal hypothesis for the production of the scalar leptoquark of $mathrm{m_{S}}$ = 1 TeV coupled to a top quark and a $\tau$ lepton, before the fit, is also overlaid.
The distribution of $\mathrm{M_{OSSF}}$ in channels with at least one light lepton pair (4L, 3L1T, 3L, 2L2T, and 2L1T) for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermion of $\mathrm{m_{\Sigma}}$ = 1 TeV in the flavor-democratic scenario, before the fit, is also overlaid.
The $\mathrm{N_{b}}$ distribution in 4L, 3L1T, 3L, 2L2T, 2L1T, 1L3T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The invariant mass distribution of the opposite-sign same-flavor ($\mathrm{M_{OSSF}}$) tau lepton pair distribution in 2L2T, 1L3T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The $\mathrm{M_{T}^{12}}$ distribution in 4L, 3L1T, 3L, 2L2T, 2L1T, 1L3T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction.
The $\mathrm{N_{b}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{L_{T}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{p_{T}^{miss}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{H_{T}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{M_{OSSF}}$ distribution in 3L, and 2L1T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The invariant mass distribution of the opposite-sign different-flavor ($\mathrm{M_{OSDF}}$) light lepton pair distribution in 3L, and 2L1T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The invariant mass distribution of the opposite-sign same-flavor ($\mathrm{M_{OSSF}}$) tau lepton pair distribution in 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The invariant mass distribution of the opposite-sign different-flavor ($\mathrm{M_{OSDF}}$) light lepton and tau lepton pair distribution in 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{M_{T}^{1}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{M_{T}^{12}}$ distribution in 3L, 2L1T, and 1L2T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The model independent fundamental table categories for the combined 2016-2018 data set, as defined in Table 1. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The $\mathrm{N_{b}}$ distribution in 4L, 3L1T, 2L2T, and 1L3T events for the combined 2016-2018 data set. The rightmost bin contains the overflow events. The gray band represents the sum of statistical and systematic uncertainties on the SM background predictions.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 3L channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 2L1T and 1L2T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 3L channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 2L1T and 1L2T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 4L, 3L1T, 2L2T, and 1L3T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table in 4L, 3L1T, 2L2T, and 1L3T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 3L channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 2L1T and 1L2T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 3L channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 2L1T and 1L2T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 4L, 3L1T, 2L2T, and 1L3T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the fundamental $\mathrm{S_{T}}$ table in 4L, 3L1T, 2L2T, and 1L3T channels for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 1B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 1B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 1L2T channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. An example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid. For this category, the signal yield is negligible and is not visible in the figure.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 1B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L 2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 1B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 2L1T 2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 1L2T channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. An example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid. For this category, the signal yield is negligible and is not visible in the figure.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 4L 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 4L 1B/2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L1T, 2L2T, and 1L3T channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 4L 0B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 4L 1B/2B channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The SR distributions of the advanced $\mathrm{S_{T}}$ table in 3L1T, 2L2T, and 1L3T channel for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-L BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 200 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-M BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 400 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The VLL-H BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 900 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 100 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 300 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 550 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The SS-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the scenario with mixing exclusively to $\tau$ lepton for $\mathrm{m_{\Sigma}}$ = 850 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 3-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{e}+B_{\mu}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and an electron for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-VL $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 200 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-L $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 400 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-M $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 700 GeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2016 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2017 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
The LQ-H $\mathrm{B_{\tau}=1}$ BDT regions for the 4-lepton channels for the 2018 data set. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background prediction. The expected SM background distributions and the uncertainties are shown after fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a $\tau lepton$ for $\mathrm{m_{S}}$ = 1.2 TeV, before the fit, is also overlaid.
Observed and expected upper limits at 95%% CL on the production cross section for the type-III seesaw fermions in the flavor-democratic scenario using the table schemes and the BDT regions of the SS-M and the SS-H $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ BDTs. To the left of the vertical dashed gray line, the limits are shown from the advanced $\mathrm{S_{T}}$ table, and to the right the limits are shown from the BDT regions.
Observed and expected upper limits at 95%% CL on the production cross section for the vector-like $\mathrm{\tau}$ leptons: doublet model. To the left of the vertical dashed gray line, the limits are shown from the advanced $\mathrm{S_{T}}$ table, and to the right the limits are shown from the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks: $\mathrm{B_{\tau}=1}$ and $\mathrm{\beta=1}$. To the left of the vertical dashed gray line, the limits are shown from the advanced $\mathrm{S_{T}}$ table, and to the right the limits are shown from the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks: $\mathrm{B_{e}=1}$ and $\mathrm{\beta=1}$. To the left of the vertical dashed gray line, the limits are shown from the advanced $\mathrm{S_{T}}$ table, and to the right the limits are shown from the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks: $\mathrm{B_{\mu}=1}$ and $\mathrm{\beta=1}$. To the left of the vertical dashed gray line, the limits are shown from the advanced $\mathrm{S_{T}}$ table, and to the right the limits are shown from the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\mathrm{\tau}$ leptons: singlet model. The limit is shown from the advanced $\mathrm{S_{T}}$ table for all masses.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=B_{\mu}=B_{\tau}}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\mu}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\mu}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\mu}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\mu}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{e}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\tau}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\tau}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\tau}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the type-III seesaw fermions in the $\mathrm{B_{\tau}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\mu}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\mu}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\mu}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\mu}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{e}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{e}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{e}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{e}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\tau}=1}$ scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\tau}=1}$ scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\tau}=1}$ scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\tau}=1}$ scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the doublet scenario using the BDT regions.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the doublet scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the doublet scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the doublet scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the singlet scenario using the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the singlet scenario using the Fundamental $\mathrm{S_{T}}$ table.
Observed and expected upper limits at 95% CL on the production cross section for the vector-like $\tau$ leptons in the singlet scenario using the Advanced $\mathrm{S_{T}}$ table.
Observed lower limits at 95% CL on the mass of the type-III seesaw fermions in the plane defined by $\mathrm{B_{e}}$ and $\mathrm{B_{\tau}}$, with the constraint that $\mathrm{B_{e}+B_{\mu}+B_{\tau}=1}$. These limits arise from the SS-H $\mathrm{B_{\tau}=1}$ BDT when $\mathrm{B_{\tau}\geq0.9}$, and by the SS-H $\mathrm{B_{e}+B_{\mu}+B_{\tau}=1}$ BDT for the other decay branching fraction combinations.
Median Expected lower limits at 95% CL on the mass of the type-III seesaw fermions in the plane defined by $\mathrm{B_{e}}$ and $\mathrm{B_{\tau}}$, with the constraint that $\mathrm{B_{e}+B_{\mu}+B_{\tau}=1}$. These limits arise from the SS-H $\mathrm{B_{\tau}=1}$ BDT when $\mathrm{B_{\tau}\geq0.9}$, and by the SS-H $\mathrm{B_{e}+B_{\mu}+B_{\tau}=1}$ BDT for the other decay branching fraction combinations.
Acceptance times efficiency values for the major SM backgrounds WZ, ZZ, and ttZ in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample. The statistical uncertainty on the acceptance times efficiency values is insignificant with respect to the quoted precision.
Acceptance times efficiency values with statistical uncertainty for the vector-like $\mathrm{\tau}$ lepton model in the doublet scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the vector-like $\mathrm{\tau}$ lepton model in the singlet scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the type-III seesaw fermions in the $\mathrm{(B_{e}=B_{\mu}=B_{\tau})}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the type-III seesaw fermions in the $\mathrm{(B_{e}=1)}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the type-III seesaw fermions in the $\mathrm{(B_{\mu}=1)}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the type-III seesaw fermions in the $\mathrm{B_{\tau}=1)}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\tau}=1}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{e}=1}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Acceptance times efficiency values with statistical uncertainty for the scalar leptoquarks with $\mathrm{\beta=1}$ in the $\mathrm{B_{\mu}=1}$ scenario in the signal regions of all seven multilepton channels. The product is defined as the ratio of the total reconstructed yield in a given channel (after all the corrections and scale factor implementation) to the product of luminosity and the production cross section of the given simulation sample.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of $\tau$ leptons for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of $\tau$ leptons for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of $\tau$ leptons for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of $\tau$ leptons for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of $\tau$ leptons for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of $\tau$ leptons for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for electrons in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of $\tau$ leptons for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of $\tau$ leptons for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|<1.2}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of $\tau$ leptons for 0.2<dRmin<0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of $\tau$ leptons for dRmin>0.4. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for muons in the $\mathrm{|\eta|>1.2}$ region, arising from the decay of $\tau$ leptons for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 1-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|<1.1}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{|\eta|>1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for dRmin>0.2. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}<2}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
Reconstruction efficiency and associated uncertainty maps for 3-prong $\tau_{h}$ in the $\mathrm{1.1<|\eta|<1.6}$ region, arising from the decay of SM gauge bosons (W/Z/h) for $\mathrm{N_{j}>1}$. The lepton efficiency is estimated in a simulated event sample for the ZZ process. For a given input generator-level $\mathrm{p_{T}}$, the efficiency map provides the probability distribution of the reconstructed $\mathrm{p_{T}}$, accounting for reconstruction and identification efficiency, and the $\mathrm{p_{T}}$ resolution. The x-axis and the y-axis represent bins in the reconstructed and generated lepton $\mathrm{p_{T}}$, respectively.
The SR distributions of the Fundamental $\mathrm{L_{T}+p_{T}^{miss}}$ table for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the type-III seesaw heavy fermions in the flavor-democratic scenario for $\mathrm{m_{\Sigma}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the Fundamental $\mathrm{S_{T}}$ table for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the vector-like $\tau$ lepton in the doublet scenario for $\mathrm{m_{\tau'}}$ = 1 TeV, before the fit, is also overlaid.
The SR distributions of the Advanced $\mathrm{S_{T}}$ table for the combined 2016-2018 data set. The detailed description of the bin numbers can be found in Tables 3-6 in the paper. The lower panel shows the ratio of observed events to the total expected background prediction. The gray band on the ratio represents the sum of statistical and systematic uncertainties in the SM background predictions. The expected SM background distributions and the uncertainties are shown before fitting the data under the background-only hypothesis. For illustration, an example signal hypothesis for the production of the scalar leptoquark coupled to a top quark and a muon for $\mathrm{m_{S}}$ = 1.4 TeV, before the fit, is also overlaid.
A direct search for Higgs bosons produced via vector-boson fusion and subsequently decaying into invisible particles is reported. The analysis uses 139 $\text{fb}^{-1}$ of $pp$ collision data at a centre-of-mass energy of $\sqrt{s}$=13 $\text{TeV}$ recorded by the ATLAS detector at the LHC. The observed numbers of events are found to be in agreement with the background expectation from Standard Model processes. For a scalar Higgs boson with a mass of 125 $\text{GeV}$ and a Standard Model production cross section, an observed upper limit of $0.145$ is placed on the branching fraction of its decay into invisible particles at 95% confidence level, with an expected limit of $0.103$. These results are interpreted in the context of models where the Higgs boson acts as a portal to dark matter, and limits are set on the scattering cross section of weakly interacting massive particles and nucleons. Invisible decays of additional scalar bosons with masses from 50 $\text{GeV}$ to 2 $\text{TeV}$ are also studied, and the derived upper limits on the cross section times branching fraction decrease with increasing mass from 1.0 $\text{pb}$ for a scalar boson mass of 50 $\text{GeV}$ to 0.1 $\text{pb}$ at a mass of 2 $\text{TeV}$.
Yields after each selection criterion for a signal sample of an invisibly decaying Higgs boson produced in VBF and ggF for 139 $fb^{-1}$ of data. The lines 'Timing of j1/j2' are referring to requirements that are part of the jet cleaning, and which ensure that the timing of the two leading jets is compatible with the bunch crossing. The last sixteen rows show the yield in each SR bin and the efficiency with respect to the inclusive signal region.
We present measurements of the cross section and double-helicity asymmetry $A_{LL}$ of direct-photon production in $\vec{p}+\vec{p}$ collisions at $\sqrt{s}=510$ GeV. The measurements have been performed at midrapidity ($|\eta|<0.25$) with the PHENIX detector at the Relativistic Heavy Ion Collider. At relativistic energies, direct photons are dominantly produced from the initial quark-gluon hard scattering and do not interact via the strong force at leading order. Therefore, at $\sqrt{s}=510$ GeV, where leading-order-effects dominate, these measurements provide clean and direct access to the gluon helicity in the polarized proton in the gluon-momentum-fraction range $0.02
Cross sections for inclusive and isolated direct photons as a function of $p_T$. Not shown are 10% absolute luminosity uncertainties.
Double helicity asymmetry $A_{LL}$ $vs$ $p_{T}$ for isolated direct-photon production in polarized $\vec{p}+\vec{p}$ collisions at $\sqrt{s}=510$ GeV at midrapidity. Not shown are $3.9 \times 10^{-4}$ shift uncertainty from relative luminosity and 6.6% scale uncertainty from polarization.
A search for resonant Higgs boson pair production in the $b\bar{b}b\bar{b}$ final state is presented. The analysis uses 126-139 fb$^{-1}$ of $pp$ collision data at $\sqrt{s}$ = 13 TeV collected with the ATLAS detector at the Large Hadron Collider. The analysis is divided into two channels, targeting Higgs boson decays which are reconstructed as pairs of small-radius jets or as individual large-radius jets. Spin-0 and spin-2 benchmark signal models are considered, both of which correspond to resonant $HH$ production via gluon$-$gluon fusion. The data are consistent with Standard Model predictions. Upper limits are set on the production cross-section times branching ratio to Higgs boson pairs of a new resonance in the mass range from 251 GeV to 5 TeV.
Cumulative acceptance times efficiency as a function of resonance mass for each event selection step in the resolved channel for the spin-0 signal models. The local maximum at 251 GeV is a consequence of the near-threshold kinematics.
Cumulative acceptance times efficiency as a function of resonance mass for each event selection step in the resolved channel for the spin-2 signal models. The local maximum at 251 GeV is a consequence of the near-threshold kinematics.
Corrected $m(HH)$ distribution in the resolved $4b$ validation region (dots), compared with the reweighted distribution in $2b$ validation region (teal histogram). The error bars on the $4b$ points represent the Poisson uncertainties corresponding to their event yields. The final bin includes overflow. The background uncertainty (gray band) is computed by adding all individual components in quadrature. The bottom panel shows the difference between the $4b$ and reweighted $2b$ distributions, relative to the $2b$ distribution.
Corrected $m(HH)$ distribution in the resolved $4b$ signal region (dots), after the fit under the background-only hypothesis. The error bars on the $4b$ points represent the Poisson uncertainties corresponding to their event yields. The background model (teal histogram) is shown with its total post-fit uncertainty (gray band). The final bin includes overflow. Representative spin-0 signal hypotheses (dashed, dotted, and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. The bottom panel shows the difference between the $4b$ distribution and the background model, relative to the background model. No significant excess of data relative to the SM background is observed.
Corrected $m(HH)$ distribution in the resolved $4b$ signal region (dots), after the fit under the background-only hypothesis. The error bars on the $4b$ points represent the Poisson uncertainties corresponding to their event yields. The background model (teal histogram) is shown with its total post-fit uncertainty (gray band). The final bin includes overflow. Representative spin-2 signal hypotheses (dashed, dotted, and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. The bottom panel shows the difference between the $4b$ distribution and the background model, relative to the background model. No significant excess of data relative to the SM background is observed.
Cumulative signal acceptance times efficiency as a function of the resonance mass for various selection steps in the boosted channel. The steps up to the $b$-tag categorization are shown for the spin-0.
Cumulative signal acceptance times efficiency as a function of the resonance mass for various selection steps in the boosted channel. The steps up to the $b$-tag categorization are shown for the spin-2.
Cumulative signal acceptance times efficiency as a function of the resonance mass for various selection steps in the boosted channel. The efficiencies of the three b-tag categories are shown for the spin-0 scenario; this efficiency is obtained after the other selection steps including the SR definition. The signal efficiency in the 4b region has a maximum around 1.5 TeV. Above that value the track-jets start to merge together, and for the highest resonance masses the 2b category becomes the most efficient.
Cumulative signal acceptance times efficiency as a function of the resonance mass for various selection steps in the boosted channel. The efficiencies of the three b-tag categories are shown for the spin-2 scenario; this efficiency is obtained after the other selection steps including the SR definition. The signal efficiency in the 4b region has a maximum around 1.5 TeV. Above that value the track-jets start to merge together, and for the highest resonance masses the 2b category becomes the most efficient.
Comparison of the background model (stacked histograms) with data (dots) in the $2b$ validation region. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background uncertainty (gray band) is computed by adding all individual components in quadrature and is not allowed to extend below zero.
Comparison of the background model (stacked histograms) with data (dots) in the $3b$ validation region. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background uncertainty (gray band) is computed by adding all individual components in quadrature and is not allowed to extend below zero.
Comparison of the background model (stacked histograms) with data (dots) in the $4b$ validation region. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background uncertainty (gray band) is computed by adding all individual components in quadrature and is not allowed to extend below zero.
The $m(HH)$ distributions in the boosted $2b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-0 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
The $m(HH)$ distributions in the boosted $2b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-2 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
The $m(HH)$ distributions in the boosted $3b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-0 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
The $m(HH)$ distributions in the boosted $3b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-2 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
The $m(HH)$ distributions in the boosted $4b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-0 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
The $m(HH)$ distributions in the boosted $4b$ signal regions (dots), after the fit under the background-only hypothesis. The error bars on the data points represent the Poisson uncertainties corresponding to their event yields. The background model (stacked histogram) is shown with its total post-fit uncertainty (gray band). The uncertainty bands are defined using an ensemble of curves constructed by sampling a multivariate Gaussian probability density function built from the covariance matrix of the fit. Representative spin-2 signal hypotheses (dashed and dashed-dotted lines) are overlaid, normalized to the overall expected limits on their cross-sections. No significant excess of data relative to the SM background is observed.
Expected (dashed black lines) and observed (solid black lines) 95% CL upper limits on the cross-section of resonant $HH$ production in the spin-0 signal models. The $\pm 1 \sigma$ and $\pm 2 \sigma$ uncertainty ranges for the expected limits (colored bands) are shown. Expected limits using each of the resolved and boosted channels individually (dashed colored lines) are shown. The nominal $H\rightarrow b\bar{b}$ branching ratio is taken as 0.582.
Expected (dashed black lines) and observed (solid black lines) 95% CL upper limits on the cross-section of resonant $HH$ production in the spin-2 signal models. The $\pm 1 \sigma$ and $\pm 2 \sigma$ uncertainty ranges for the expected limits (colored bands) are shown. Expected limits using each of the resolved and boosted channels individually (dashed colored lines) are shown. The theoretical prediction for the bulk RS model with $k/\bar{M}_{\text{Pl}} = 1$ (solid red line) is shown; the decrease below 350 GeV is due to a sharp reduction in the $G^{*}_{\text{KK}} \rightarrow HH$ branching ratio. The nominal $H\rightarrow b\bar{b}$ branching ratio is taken as 0.582.
Since the discovery of the Higgs boson in 2012, detailed studies of its properties have been ongoing. Besides its mass, its width - related to its lifetime - is an important parameter. One way to determine this quantity is by measuring its off-shell production, where the Higgs boson mass is far away from its nominal value, and relating it to its on-shell production, where the mass is close to the nominal value. Here, we report evidence for such off-shell contributions to the production cross section of two Z bosons with data from the CMS experiment at the CERN Large Hadron Collider. We constrain the total rate of the off-shell Higgs boson contribution beyond the Z boson pair production threshold, relative to its standard model expectation, to the interval [0.0061, 2.0] at 95% confidence level. The scenario with no off-shell contribution is excluded at a $p$-value of 0.0003 (3.6 standard deviations). We measure the width of the Higgs boson as $\Gamma_{\mathrm{H}}$ = 3.2 $_{-1.7}^{+2.4}$ MeV, in agreement with the standard model expectation of 4.1 MeV. In addition, we set constraints on anomalous Higgs boson couplings to W and Z boson pairs.
GGsm vs -2dNLL (SM-like (f_{ai}=0) observed)
GGsm vs -2dNLL (f_{a2} (u) observed)
GGsm vs -2dNLL (f_{a3} (u) observed)
GGsm vs -2dNLL (f_{#Lambda1} (u) observed)
GGsm vs -2dNLL (SM-like (f_{ai}=0) expected)
GGsm vs -2dNLL (f_{a2} (u) expected)
GGsm vs -2dNLL (f_{a3} (u) expected)
GGsm vs -2dNLL (f_{#Lambda1} (u) expected)
GGsm vs -2dNLL (2l2#nu off-shell + 4l on-shell observed)
GGsm vs -2dNLL (4l off-shell + 4l on-shell observed)
GGsm vs -2dNLL (2l2#nu off-shell + 4l on-shell expected)
GGsm vs -2dNLL (4l off-shell + 4l on-shell expected)
r_offshell vs -2dNLL (R_{V,F}^{off-shell}=1 observed)
r_offshell vs -2dNLL (R_{V,F}^{off-shell} (u) observed)
r_offshell vs -2dNLL (R_{V,F}^{off-shell}=1 (2l2#nu) observed)
r_offshell vs -2dNLL (R_{V,F}^{off-shell} (u, 2l2#nu) observed)
r_offshell vs -2dNLL (R_{V,F}^{off-shell}=1 expected)
r_offshell vs -2dNLL (R_{V,F}^{off-shell} (u) expected)
r_offshell vs -2dNLL (R_{V,F}^{off-shell}=1 (2l2#nu) expected)
r_offshell vs -2dNLL (R_{V,F}^{off-shell} (u, 2l2#nu) expected)
rf_offshell vs -2dNLL (2l2#nu+4l observed)
rf_offshell vs -2dNLL (Only 2l2#nu observed)
rf_offshell vs -2dNLL (2l2#nu+4l expected)
rf_offshell vs -2dNLL (Only 2l2#nu expected)
rv_offshell vs -2dNLL (2l2#nu+4l observed)
rv_offshell vs -2dNLL (Only 2l2#nu observed)
rv_offshell vs -2dNLL (2l2#nu+4l expected)
rv_offshell vs -2dNLL (Only 2l2#nu expected)
rf_offshell vs rv_offshell observed
fa2 vs -2dNLL (#Gamma_{H}=4.1 MeV observed)
fa2 vs -2dNLL (#Gamma_{H} (u) observed)
fa2 vs -2dNLL (On-shell 4l observed)
fa2 vs -2dNLL (#Gamma_{H}=4.1 MeV expected)
fa2 vs -2dNLL (#Gamma_{H} (u) expected)
fa2 vs -2dNLL (On-shell 4l expected)
fa3 vs -2dNLL (#Gamma_{H}=4.1 MeV observed)
fa3 vs -2dNLL (#Gamma_{H} (u) observed)
fa3 vs -2dNLL (On-shell 4l observed)
fa3 vs -2dNLL (#Gamma_{H}=4.1 MeV expected)
fa3 vs -2dNLL (#Gamma_{H} (u) expected)
fa3 vs -2dNLL (On-shell 4l expected)
fL1 vs -2dNLL (#Gamma_{H}=4.1 MeV observed)
fL1 vs -2dNLL (#Gamma_{H} (u) observed)
fL1 vs -2dNLL (On-shell 4l observed)
fL1 vs -2dNLL (#Gamma_{H}=4.1 MeV expected)
fL1 vs -2dNLL (#Gamma_{H} (u) expected)
fL1 vs -2dNLL (On-shell 4l expected)
Suppression of the $J/\psi$ nuclear-modification factor has been seen as a trademark signature of final-state effects in large collision systems for decades. In small systems, the nuclear modification was attributed to cold-nuclear-matter effects until the observation of strong differential suppression of the $\psi(2S)$ state in $p/d$ $+$ $A$ collisions suggested the presence of final-state effects. Results of $J/\psi$ and $\psi(2S)$ measurements in the dimuon decay channel are presented here for $p$ $+$ $p$, $p$ $+$Al, and $p$ $+$Au collision systems at $\sqrt{s_{_{NN}}}=200$ GeV. The results are predominantly shown in the form of the nuclear-modification factor, $R_{pA}$, the ratio of the $\psi(2S)$ invariant yield per nucleon-nucleon collision in collisions of proton on target nucleus to that in $p$ $+$ $p$ collisions. Measurements of the $J/\psi$ and $\psi(2S)$ nuclear-modification factor are compared with shadowing and transport-model predictions, as well as to complementary measurements at Large-Hadron-Collider energies.
PSI(2S)-->MU+MU- invariant yields in p+p, p+Al, and p+Au collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
J/PSI(1S)-->MU+MU- invariant yields in p+p, p+Al, and p+Au collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
PSI(2S)-->MU+MU- nuclear modification in p+Al collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
J/PSI(1S)-->MU+MU- nuclear modification in p+Al collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
PSI(2S)-->MU+MU- nuclear modification in p+Au collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
J/PSI(1S)-->MU+MU- nuclear modification in p+Au collisions as a function of rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
PSI(2S)-->MU+MU- nuclear modification in p+Au collisions as a function of centrality at forward rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
PSI(2S)-->MU+MU- nuclear modification in p+Au collisions as a function of centrality at backward rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
J/PSI(1S)-->MU+MU- nuclear modification in p+Au collisions as a function of centrality. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. An additional global systematic uncertainty is provided in each column heading, which applies to all data points per column.
Invariant yield ratio of PSI(2S)-->MU+MU- with respect to J/PSI(1S)-->MU+MU- in p+p collisions at rapidity 1.2 < |y| < 2.2. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. The global systematic uncertainty cancels when taking the ratio.
Invariant yield ratio of PSI(2S)-->MU+MU- with respect to J/PSI(1S)-->MU+MU- in p+Au collisions as a function of centrality at forward rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. The global systematic uncertainty cancels when taking the ratio.
Invariant yield ratio of PSI(2S)-->MU+MU- with respect to J/PSI(1S)-->MU+MU- in p+Au collisions as a function of centrality at backward rapidity. The statistical and systematic uncertainties vary point-to-point and are listed for each measured value. The global systematic uncertainty cancels when taking the ratio.
This paper presents studies of Bose-Einstein correlations (BEC) in proton-proton collisions at a centre-of-mass energy of 13 TeV, using data from the ATLAS detector at the CERN Large Hadron Collider. Data were collected in a special low-luminosity configuration with a minimum-bias trigger and a high-multiplicity track trigger, accumulating integrated luminosities of 151 $\mu$b$^{-1}$ and 8.4 nb$^{-1}$ respectively. The BEC are measured for pairs of like-sign charged particles, each with $|\eta|$ < 2.5, for two kinematic ranges: the first with particle $p_T$ > 100 MeV and the second with particle $p_T$ > 500 MeV. The BEC parameters, characterizing the source radius and particle correlation strength, are investigated as functions of charged-particle multiplicity (up to 300) and average transverse momentum of the pair (up to 1.5 GeV). The double-differential dependence on charged-particle multiplicity and average transverse momentum of the pair is also studied. The BEC radius is found to be independent of the charged-particle multiplicity for high charged-particle multiplicity (above 100), confirming a previous observation at lower energy. This saturation occurs independent of the transverse momentum of the pair.
Comparison of single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q) and C<sub>2</sub><sup>MC</sup>(Q), with the two-particle double-ratio correlation function, R<sub>2</sub>(Q), for the high-multiplicity track (HMT) events using the opposite hemisphere (OHP) like-charge particles pairs reference sample for k<sub>T</sub> - interval 1000 < k<sub>T</sub> ≤ 1500 MeV.
Comparison of single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q) and C<sub>2</sub><sup>MC</sup>(Q), with the two-particle double-ratio correlation function, R<sub>2</sub>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - interval 1000 < k<sub>T</sub> ≤ 1500 MeV.
The Bose-Einstein correlation (BEC) parameter R as a function of n<sub>ch</sub> for MB events using different MC generators in the calculation of R<sub>2</sub>(Q). The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameter R as a function of n<sub>ch</sub> for HMT events using different MC generators in the calculation of R<sub>2</sub>(Q). The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameter R as a function of k<sub>T</sub> for MB events using different MC generators in the calculation of R<sub>2</sub>(Q). The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameter λ as a function of k<sub>T</sub> for MB events using different MC generators in the calculation of R<sub>2</sub>(Q). The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The two-particle double-ratio correlation function, R<sub>2</sub>(Q), for pp collisions for track p<sub>T</sub> >100 MeV at √s=13 TeV in the multiplicity interval 71 ≤ n<sub>ch</sub> < 80 for the minimum-bias (MB) events. The blue dashed and red solid lines show the results of the exponential and Gaussian fits, respectively. The region excluded from the fits is shown. The statistical uncertainty and the systematic uncertainty for imperfections in the data reconstruction procedure are added in quadrature.
The two-particle double-ratio correlation function, R<sub>2</sub>(Q), for pp collisions for track p<sub>T</sub> >100 MeV at √s=13 TeV in the multiplicity interval 231 ≤ n<sub>ch</sub> < 300 for the high-multiplicity track (HMT) events. The blue dashed and red solid lines show the results of the exponential and Gaussian fits, respectively. The region excluded from the fits is shown. The statistical uncertainty and the systematic uncertainty for imperfections in the data reconstruction procedure are added in quadrature.
The dependence of the correlation strength, λ(m<sub>ch</sub>), on rescaled multiplicity, m<sub>ch</sub>, obtained from the exponential fit of the R<sub>2</sub>(Q) correlation functions for tracks with p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV for the minimum-bias (MB) and high multiplicity track (HMT) data. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the exponential fit of λ(m<sub>ch</sub>) for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively.
The dependence of the correlation strength, λ(m<sub>ch</sub>), on rescaled multiplicity, m<sub>ch</sub>, obtained from the exponential fit of the R<sub>2</sub>(Q) correlation functions for tracks with p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV for the minimum-bias (MB) and high multiplicity track (HMT) data. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the exponential fit of λ(m<sub>ch</sub>) for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively.
The dependence of the correlation strength, λ(m<sub>ch</sub>), on rescaled multiplicity, m<sub>ch</sub>, obtained from the exponential fit of the R<sub>2</sub>(Q) correlation functions for tracks with p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV for the minimum-bias (MB) and high multiplicity track (HMT) data. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the exponential fit of λ(m<sub>ch</sub>) for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively.
The dependence of the correlation strength, λ(m<sub>ch</sub>), on rescaled multiplicity, m<sub>ch</sub>, obtained from the exponential fit of the R<sub>2</sub>(Q) correlation functions for tracks with p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV for the minimum-bias (MB) and high multiplicity track (HMT) data. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the exponential fit of λ(m<sub>ch</sub>) for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively.
The dependence of the source radius, R(m<sub>ch</sub>), on m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively.
The dependence of the source radius, R(m<sub>ch</sub>), on m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively.
The dependence of the source radius, R(m<sub>ch</sub>), on m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively.
The dependence of the source radius, R(m<sub>ch</sub>), on m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively.
The dependence of the R(m<sub>ch</sub>) on ∛m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively
The dependence of the R(m<sub>ch</sub>) on ∛m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively
The dependence of the R(m<sub>ch</sub>) on ∛m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively
The dependence of the R(m<sub>ch</sub>) on ∛m<sub>ch</sub>. The uncertainties represent the sum in quadrature of the statistical and asymmetric systematic contributions. The black and blue solid curves represent the fit of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> < 1.2 for p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV, respectively. The black and blue dotted curves are extensions of the black and blue solid curves beyond ∛m<sub>ch</sub> > 1.2, respectively. The black and brown dashed curves represent the saturation value of R(m<sub>ch</sub>) for ∛m<sub>ch</sub> > 1.45 with p<sub>T</sub> >100 MeV and for ∛m<sub>ch</sub> > 1.6 with p<sub>T</sub> >500 MeV, respectively
Comparison of single-ratio two-particle correlation functions, using the unlike-charge particle (UCP) pair reference sample, for minimum-bias (MB) events, showing C<sub>2</sub><sup>data</sup>(Q) (top panel) at 13 TeV (black circles) and 7 TeV (open blue circles), and the ratio of C<sub>2</sub><sup>7 TeV</sup> (Q) to C<sub>2</sub><sup>13 TeV</sup> (Q) (bottom panel). Comparison of C<sub>2</sub><sup>data</sup> (Q) for representative multiplicity region 3.09 < m<sub>ch</sub> ≤ 3.86. The statistical and systematic uncertainties, combined in quadrature, are presented. The systematic uncertainties include track efficiency, Coulomb correction, non-closure and multiplicity-unfolding uncertainties.
Comparison of single-ratio two-particle correlation functions, using the unlike-charge particle (UCP) pair reference sample, for minimum-bias (MB) events, showing C<sub>2</sub><sup>data</sup>(Q) (top panel) at 13 TeV (black circles) and 7 TeV (open blue circles), and the ratio of C<sub>2</sub><sup>7 TeV</sup> (Q) to C<sub>2</sub><sup>13 TeV</sup> (Q) (bottom panel). Comparison of C<sub>2</sub><sup>data</sup> (Q) for representative k<sub>T</sub> region 400 < k<sub>T</sub> ≤500 MeV. The statistical and systematic uncertainties, combined in quadrature, are presented. The systematic uncertainties include track efficiency, Coulomb correction, non-closure and multiplicity-unfolding uncertainties.
The k<sub>T</sub> dependence of the correlation strength, λ(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to λ(k<sub>T</sub>).
The k<sub>T</sub> dependence of the correlation strength, λ(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to λ(k<sub>T</sub>).
The k<sub>T</sub> dependence of the correlation strength, λ(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to λ(k<sub>T</sub>).
The k<sub>T</sub> dependence of the correlation strength, λ(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to λ(k<sub>T</sub>).
The k<sub>T</sub> dependence of the source radius, R(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to R(k<sub>T</sub>).
The k<sub>T</sub> dependence of the source radius, R(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to R(k<sub>T</sub>).
The k<sub>T</sub> dependence of the source radius, R(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to R(k<sub>T</sub>).
The k<sub>T</sub> dependence of the source radius, R(k<sub>T</sub>), obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions for events with multiplicity n<sub>ch</sub> ≥ 2 and transfer momentum of tracks with p<sub>T</sub> >100 MeV and p<sub>T</sub> >500 MeV at √s=13 TeV for the minimum-bias (MB) and high-multiplicity track (HMT) events. The uncertainties represent the sum in quadrature of the statistical and systematic contributions. The curves represent the exponential fits to R(k<sub>T</sub>).
The two-dimensional dependence on m<sub>ch</sub> and k<sub>T</sub> for p<sub>T</sub> > 100 MeV for the correlation strength, λ, obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions using the MB sample for m<sub>ch</sub> ≤ 3.08 and the HMT sample for m<sub>ch</sub> > 3.08.
The two-dimensional dependence on m<sub>ch</sub> and k<sub>T</sub> for p<sub>T</sub> > 100 MeV for the source radius, R, obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions using the MB sample for m<sub>ch</sub> ≤ 3.08 and the HMT sample for m<sub>ch</sub> > 3.08.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.1 and 0.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.1 and 0.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.1 and 0.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.1 and 0.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 100 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The fit parameter μ describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter μ on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter μ describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter μ on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter μ describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter μ on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter μ describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter μ on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter ν describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter ν on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter ν describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter ν on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter ν describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter ν on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The fit parameter ν describing the dependence of the correlation strength, λ, on charged-particle scaled multiplicity, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid (blue dashed) curve represents the exponential fit of the dependence of parameter ν on m<sub>ch</sub> for tracks with p<sub>T</sub> >100 MeV (p<sub>T</sub> >500 MeV).
The parameter ξ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the saturated value of the parameter ξ for m<sub>ch</sub> > 3.0 for tracks with p<sub>T</sub> >100 MeV and for m<sub>ch</sub> > 2.8 for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter ξ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the saturated value of the parameter ξ for m<sub>ch</sub> > 3.0 for tracks with p<sub>T</sub> >100 MeV and for m<sub>ch</sub> > 2.8 for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter ξ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the saturated value of the parameter ξ for m<sub>ch</sub> > 3.0 for tracks with p<sub>T</sub> >100 MeV and for m<sub>ch</sub> > 2.8 for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter ξ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the saturated value of the parameter ξ for m<sub>ch</sub> > 3.0 for tracks with p<sub>T</sub> >100 MeV and for m<sub>ch</sub> > 2.8 for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter κ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the exponential fit to the parameter κ for tracks with p<sub>T</sub> >100 MeV and for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter κ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the exponential fit to the parameter κ for tracks with p<sub>T</sub> >100 MeV and for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter κ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the exponential fit to the parameter κ for tracks with p<sub>T</sub> >100 MeV and for tracks with p<sub>T</sub> >500 MeV, respectively.
The parameter κ describing the dependence of the source radius, R, on charged-particle scaled multiplicity, m<sub>ch</sub>, for track p<sub>T</sub>>100 MeV and track p<sub>T</sub>>500 MeV in the minimum-bias (MB) and high-multiplicity track (HMT) samples at √s = 13 TeV. The error bars and boxes represent the statistical and systematic contributions, respectively. The black solid and blue dashed curves represent the exponential fit to the parameter κ for tracks with p<sub>T</sub> >100 MeV and for tracks with p<sub>T</sub> >500 MeV, respectively.
The two-dimensional dependence on m<sub>ch</sub> and k<sub>T</sub> for p<sub>T</sub> > 500 MeV for the correlation strength, λ, obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions using the MB sample for m<sub>ch</sub> ≤ 3.08 and the HMT sample for m<sub>ch</sub> > 3.08.
The two-dimensional dependence on m<sub>ch</sub> and k<sub>T</sub> for p<sub>T</sub> > 500 MeV for the source radius, R, obtained from the exponential fit to the R<sub>2</sub>(Q) correlation functions using the MB sample for m<sub>ch</sub> ≤ 3.08 and the HMT sample for m<sub>ch</sub> > 3.08.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter λ for p<sub>T</sub> > 500 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected low m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of k<sub>T</sub> in selected high m<sub>ch</sub> intervals. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
The parameter R for p<sub>T</sub> > 500 MeV as a function of m<sub>ch</sub> in k<sub>T</sub> intervals between 0.5 and 1.5 GeV. The error bars and boxes represent the statistical and systematic contributions, respectively.
ATLAS and CMS results for the source radius R as a function of n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
ATLAS and CMS results for the source radius R as a function of n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
ATLAS and CMS results for the source radius R as a function of n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
ATLAS and CMS results for the source radius R as a function of ∛n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
ATLAS and CMS results for the source radius R as a function of ∛n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
ATLAS and CMS results for the source radius R as a function of ∛n<sub>ch</sub> in pp interactions at 13 TeV. The CMS results (open circles) have been adjusted (by the CMS collaboration) to the ATLAS kinematic region∶ p<sub>T</sub> > 100 MeV and |η|<2.5. The ATLAS uncertainties are the sum in quadrature of the statistical and asymmetric systematic uncertainties. For CMS, only the systematic uncertainties are shown since the statistical uncertainties are smaller than the marker size. The dashed blue (ATLAS) and black (CMS) lines represent the fit to ∛n<sub>ch</sub> at low multiplicity, continued as dotted lines beyond the fit range. The solid green (ATLAS) and broken black (CMS) lines indicate the plateau level at high multiplicity.
Systematic uncertainties (in percent) in the correlation strength, λ, and source radius, R, for the exponential fit of the two-particle double-ratio correlation functions, R<sub>2</sub>(Q), for p<sub>T</sub> > 100 MeV at √s= 13 TeV for the MB and HMT events. The choice of MC generator gives rise to asymmetric uncertainties, denoted by uparrow and downarrow. This asymmetry propagates through to the cumulative uncertainty. The columns under ‘Uncertainty range’ show the range of systematic uncertainty from the fits in the various n<sub>ch</sub> intervals.
The results of the fits to the dependencies of the correlation strength, λ, and source radius, R, on the average rescaled charged-particle multiplicity, m<sub>ch</sub>, for |η| < 2.5 and both p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV for the minimum-bias (MB) and the high-multiplicity track (HMT) events. The parameters γ and δ resulting from a joint fit to the MB and HMT data are presented. The total uncertainties are shown.
The results of the fits to the dependencies of the correlation strength, λ, and source radius, R, on the pair average transverse momentum, k<sub>T</sub>, for various functional forms and for minimum-bias (MB) and high-multiplicity track (HMT) events for p<sub>T</sub> > 100 MeV and p<sub>T</sub> > 500 MeV at √s = 13 TeV. The total uncertainties are shown.
The Bose-Einstein correlation (BEC) parameters λ and R as a function of n<sub>ch</sub> and k<sub>T</sub> using different MC generators in the calculation of R<sub>2</sub>(Q). (a) λ versus n<sub>ch</sub> for MB events, (b) λ versus n<sub>ch</sub> for HMT events, (c) λ versus k<sub>T</sub> and (d) R versus k<sub>T</sub> for MB events. The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameters λ and R as a function of n<sub>ch</sub> and k<sub>T</sub> using different MC generators in the calculation of R<sub>2</sub>(Q). (a) λ versus n<sub>ch</sub> for MB events, (b) λ versus n<sub>ch</sub> for HMT events, (c) λ versus k<sub>T</sub> and (d) R versus k<sub>T</sub> for MB events. The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameters λ and R as a function of n<sub>ch</sub> and k<sub>T</sub> using different MC generators in the calculation of R<sub>2</sub>(Q). (a) λ versus n<sub>ch</sub> for MB events, (b) λ versus n<sub>ch</sub> for HMT events, (c) λ versus k<sub>T</sub> and (d) R versus k<sub>T</sub> for MB events. The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The Bose-Einstein correlation (BEC) parameters λ and R as a function of n<sub>ch</sub> and k<sub>T</sub> using different MC generators in the calculation of R<sub>2</sub>(Q). (a) λ versus n<sub>ch</sub> for MB events, (b) λ versus n<sub>ch</sub> for HMT events, (c) λ versus k<sub>T</sub> and (d) R versus k<sub>T</sub> for MB events. The uncertainties shown are statistical. The lower panel of each plot shows the ratio of the BEC parameters obtained using EPOS LHC (red circles), Pythia 8 Monash (blue squares) and Herwig++ UE-EE-5 (green triangles) compared with the parameters obtained using Pythia 8 A2. The gray band in the lower panels is the MC systematic uncertainty, obtained as explained in the text.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 10, (b) 11 < n<sub>ch</sub> ≤ 20, (c) 21 < n<sub>ch</sub> ≤ 30, (d) 31 < n<sub>ch</sub> ≤ 40, (e) 41 < n<sub>ch</sub> ≤ 50, (f) 51 < n<sub>ch</sub> ≤ 60, (g) 61 < n<sub>ch</sub> ≤ 70, (h) 71 < n<sub>ch</sub> ≤ 80 and (i) 81 < n<sub>ch</sub> ≤ 90. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 91 < n<sub>ch</sub> ≤ 100, (b) 101 < n<sub>ch</sub> ≤ 125, (c) 126 < n<sub>ch</sub> ≤ 150, (d) 151 < n<sub>ch</sub> ≤ 200, (e) 201 < n<sub>ch</sub> ≤ 250. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 91 < n<sub>ch</sub> ≤ 100, (b) 101 < n<sub>ch</sub> ≤ 125, (c) 126 < n<sub>ch</sub> ≤ 150, (d) 151 < n<sub>ch</sub> ≤ 200, (e) 201 < n<sub>ch</sub> ≤ 250. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 91 < n<sub>ch</sub> ≤ 100, (b) 101 < n<sub>ch</sub> ≤ 125, (c) 126 < n<sub>ch</sub> ≤ 150, (d) 151 < n<sub>ch</sub> ≤ 200, (e) 201 < n<sub>ch</sub> ≤ 250. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 91 < n<sub>ch</sub> ≤ 100, (b) 101 < n<sub>ch</sub> ≤ 125, (c) 126 < n<sub>ch</sub> ≤ 150, (d) 151 < n<sub>ch</sub> ≤ 200, (e) 201 < n<sub>ch</sub> ≤ 250. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 91 < n<sub>ch</sub> ≤ 100, (b) 101 < n<sub>ch</sub> ≤ 125, (c) 126 < n<sub>ch</sub> ≤ 150, (d) 151 < n<sub>ch</sub> ≤ 200, (e) 201 < n<sub>ch</sub> ≤ 250. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 101 < n<sub>ch</sub> ≤ 110, (b) 111 < n<sub>ch</sub> ≤ 120, (c) 121 < n<sub>ch</sub> ≤ 130, (d) 131 < n<sub>ch</sub> ≤ 140, (e) 141 < n<sub>ch</sub> ≤ 155, (f) 156 < n<sub>ch</sub> ≤ 175, (g) 176 < n<sub>ch</sub> ≤ 200, (h) 201 < n<sub>ch</sub> ≤ 230 and (i) 231 < n<sub>ch</sub> ≤ 300. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), for the high-multiplicity track (HMT) events using the unlike-charge particle (UCP) pairs reference sample for k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample for n<sub>ch</sub> - intervals∶ (a) 2 < n<sub>ch</sub> ≤ 9, (b) 10 < n<sub>ch</sub> ≤ 18, (c) 19 < n<sub>ch</sub> ≤ 27, (d) 28 < n<sub>ch</sub> ≤ 36, (e) 37 < n<sub>ch</sub> ≤ 45, (f) 46 < n<sub>ch</sub> ≤ 54, (g) 55 < n<sub>ch</sub> ≤ 63, (h) 64 < n<sub>ch</sub> ≤ 72, (i) 73 < n<sub>ch</sub> ≤ 81, (j) 82 < n<sub>ch</sub> ≤ 90, (k) 91 < n<sub>ch</sub> ≤ 113, and (l) 114 < n<sub>ch</sub> ≤ 136. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The single-ratio two-particle correlation functions, C<sub>2</sub><sup>data</sup>(Q), at 7 TeV for the minimum-bias (MB) events using the unlike-charge particle (UCP) pairs reference sample k<sub>T</sub> - intervals∶ (a) 100 < k<sub>T</sub> ≤ 200 MeV, (b) 200 < k<sub>T</sub> ≤ 300 MeV, (c) 300 < k<sub>T</sub> ≤ 400 MeV, (d) 400 < k<sub>T</sub> ≤ 500 MeV, (e) 500 < k<sub>T</sub> ≤ 600 MeV, (f) 600 < k<sub>T</sub> ≤ 700 MeV, (g) 700 < k<sub>T</sub> ≤ 1000 MeV, and (h) 1000 < k<sub>T</sub> ≤ 1500 MeV. The error bars represent the statistical uncertainties. The boxes represent the systematic uncertainties, which are the sum in quadrature of a variation of the Coulomb correction, the track reconstruction efficiency and the unfolding matrix.
The correlation strength, λ, and source radius, R, of the exponential fits to the two-particle double-ratio correlation functions, R<sub>2</sub>(Q), in dependence on the multiplicity, m<sub>ch</sub>, intervals for the minimum-bias (MB) and the high-multiplicity track (HMT) events for p<sub>T</sub> > 100 MeV at √s = 13 TeV. Statistical uncertainties for √χ<sup>2</sup>/ndf>1 are corrected by the √χ<sup>2</sup>/ndf. The total uncertainties are shown.
The correlation strength, λ, and source radius, R, of the exponential fits to the two-particle double-ratio correlation functions, R<sub>2</sub>(Q), in dependence on the multiplicity, m<sub>ch</sub>, intervals for the minimum-bias (MB) and the high-multiplicity track (HMT) events for p<sub>T</sub> > 500 MeV at √s = 13 TeV. Statistical uncertainties for √χ<sup>2</sup>/ndf>1 are corrected by the √χ<sup>2</sup>/ndf. The total uncertainties are shown.
The correlation strength, λ, and source radius, R, of the exponential fits to the two-particle double-ratio correlation functions, R<sub>2</sub>(Q), in dependence on the pair transverse momentum, k<sub>T</sub>, intervals for the minimum-bias (MB) and the high-multiplicity track (HMT) events for p<sub>T</sub> > 100 MeV at √s = 13 TeV. Statistical uncertainties for √χ<sup>2</sup>/ndf>1 are corrected by the √χ<sup>2</sup>/ndf. The total uncertainties are shown.
The correlation strength, λ, and source radius, R, of the exponential fits to the two-particle double-ratio correlation functions, R<sub>2</sub>(Q), in dependence on the pair transverse momentum, k<sub>T</sub>, intervals for the minimum-bias (MB) and the high-multiplicity track (HMT) events for p<sub>T</sub> > 500 MeV at √s = 13 TeV. Statistical uncertainties for √χ<sup>2</sup>/ndf>1 are corrected by the √χ<sup>2</sup>/ndf. The total uncertainties are shown.
A search for the pair production of heavy leptons as predicted by the type-III seesaw mechanism is presented. The search uses proton-proton collision data at a centre-of-mass energy of 13 TeV, corresponding to 139 fb$^{-1}$ of integrated luminosity recorded by the ATLAS detector during Run 2 of the Large Hadron Collider. The analysis focuses on final states with three or four electrons or muons from the possible decays of new heavy leptons via intermediate electroweak bosons. No significant deviations above the Standard Model expectation are observed; upper and lower limits on the heavy lepton production cross-section and masses are derived respectively. These results are then combined for the first time with the ones already published by ATLAS using the channel with two leptons in the final state. The observed lower limit on the mass of the type-III seesaw heavy leptons combining two, three and four lepton channels together is 910 GeV at the 95% confidence level.
Expected background yields and observed data after the background-only fit in the SRs.
Distribution of $m_{\mathrm{T},3l}$ in the ZL SR after the background-only fit. The uncertainty on the expected number of background events includes all statistical and systematic post-fit uncertainties with the correlations between various background sources taken into account.
Distribution of $m_{\mathrm{T},3l}$ in the ZL Veto SR after the background-only fit. The uncertainty on the expected number of background events includes all statistical and systematic post-fit uncertainties with the correlations between various background sources taken into account.
Distribution of $m_{\mathrm{T},3l}$ in the JNLow SR after the background-only fit. The uncertainty on the expected number of background events includes all statistical and systematic post-fit uncertainties with the correlations between various background sources taken into account.
Distribution of $H_\text{T} + E_\text{T}^\text{miss}$ in the Q0 SR after the background-only fit. The uncertainty on the expected number of background events includes all statistical and systematic post-fit uncertainties with the correlations between various background sources taken into account.
Distribution of $H_\text{T} + E_\text{T}^\text{miss}$ in the Q2 SR after the background-only fit. The uncertainty on the expected number of background events includes all statistical and systematic post-fit uncertainties with the correlations between various background sources taken into account.
Distribution of $m_{\mathrm{T},3l}$ in the ZL-CR after the background-only fit.
Distribution of $m_{\mathrm{T},3l}$ in the Fake-CR after the background-only fit.
Distribution of $H_\text{T} + E_\text{T}^\text{miss}$ in the Q0 DB-CR after the background-only fit.
Distribution of $H_\text{T} + E_\text{T}^\text{miss}$ in the Q0 RT-CR after the background-only fit.
Expected and observed exclusion limit for the combination of the two- (from Ref. EXOT-2018-33), three- and four-lepton channels, for the type-III seesaw process with the corresponding one- and two-standard-deviation uncertainty bands, showing the 95% CL upper limit on the cross-section.
Expected and observed 95% ( $CL_s$ ) exclusion limits in the three lepton channel for the type-III seesaw process with the corresponding one- and two-standard-deviation bands, showing the 95% CL upper limit on the cross-section.
Expected and observed 95% ( $CL_s$ ) exclusion limits in the four lepton channel for the type-III seesaw process with the corresponding one- and two-standard-deviation bands, showing the 95% CL upper limit on the cross-section.
Cross-sections of signal Monte Carlo samples for each mass point considered in this analysis. Leading order cross-sections ( $\sigma_{LO}$ ) are computed by the generator and then rescaled to next-to-leading cross-sections ( $\sigma_{NLO+NLL}$ ), with their corresponding uncertainties, using information taken from Refs. C1C1 and N2C1.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the ZL SR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the ZLVeto SR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the JNLow SR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the Q0 SR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the Q2 SR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the ZL CR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the Q0-DB CR. Preselection represents events with at least three leptons.
Expected signal and background yields after each of the analysis selection cuts for the 800 GeV mass hypothesis in the Q0-RT CR. Preselection represents events with at least three leptons.
Expected background yields and observed data after the background-only fit, in the three-lepton CRs and VRs.
Expected background yields and observed data after the background-only fit, in the four-lepton CRs and VRs.
Expected and observed 95% ( $CL_s$ ) exclusion limits in the three and four lepton channels for the type-III seesaw process with the corresponding one- and two-standard-deviation bands, showing the 95% CL upper limit on the cross-section.
When you search on a word, e.g. 'collisions', we will automatically search across everything we store about a record. But sometimes you may wish to be more specific. Here we show you how.
Guidance on the query string syntax can also be found in the OpenSearch documentation.
We support searching for a range of records using their HEPData record ID or Inspire ID.
About HEPData Submitting to HEPData HEPData File Formats HEPData Coordinators HEPData Terms of Use HEPData Cookie Policy
Status
Email
Forum
Twitter
GitHub
Copyright ~1975-Present, HEPData | Powered by Invenio, funded by STFC, hosted and originally developed at CERN, supported and further developed at IPPP Durham.